China Investment Casting manufacturer

AISI Standard CNC Machining Parts Hoop 2205 Stainless Steel CF3M Clamp Parts

Product Details:
Place of Origin: China
Brand Name: ABlinox
Certification: ISO9001:2015,CE
Model Number: ABL-L01
Payment & Shipping Terms:
Minimum Order Quantity: 160kg
Price: Negotiation
Packaging Details: PP bag/carton/plywood crate
Delivery Time: 35-40 days
Payment Terms: T/T, Western Union
Supply Ability: 200 Ton/month

Detail Information

Product Name: Lock Part Material: Stainless Steel 304
Usage For: Lock Weight: 0.16kg
Standrad: GB,ISO, AISI, DIN, Etc Certificate: ISO 2010
Surface Roughness: Ra 0.4um-12.21um Quality: Good Quality
Service: OEM Sample Day: 28days
High Light:

cnc machined components

,

cnc precision components

Product Description

CNC machining Parts Hoop 2205 Stainless Steel CF3M Clamp Parts AISI standard Precision Investment Casting for Europe USA 

Product Description                                                                                                                 

 

 

Place of Origin: Guangdong,China Port: Guangzhou
Material: Stainless Steel 304,201,202,CF8,,WCB,1.4408,1.4308, Size: According to drawing
Technology: Precision Investment Casting Process: CNC Machining,Surface Treatment
Surface Treatment : Customized Casting Tolerance: CT4~CT6
Brand Name: ABLinox or OEM Packing: As client’s requirements
Standard: GB,DIN,AISI,ASTM,BS,JIS Certification: ISO9001:2015
Quality Control: 100% inspection Lead Time: 30~35 Days
Application: Industrial Parts Steering Knuckle

 

 

Main products                                                                                                                           

 

 

Pipe fittings
Bar fittings
Hrandrail fittings
Glass Clamp/Glass Spigot
Spider
commercial/industrial kitchen equipment
Marin Hardware

 

 

Production Process                                                                                                                

 

1.TOOL MAKING
A wax injection mold is designed and built to produce castings per customer specifications.
2. WAX PRODUCTION
A wax pattern is produced from the wax injection mold.
3. PATTERN ASSEMBLY
Wax patterns are attached to gating system by hot knife.
4. SHELL MAKING
The pattern assembly is dipped into a ceramic slurry, coated with a refractory material and dried. The process is repeated until the desired thickness and strength is achieved.
5. DEWAXING
Using regulated steam pressure, an autoclave melts and remove the wax from the ceramic shells.
6.SHELL PREHEAT
High temperature ovens cure and preheat the ceramic shells before pouring.
7.CASTING
Pre-heated Ceramic cavities are poured with the molten metal.
8.KNOCK OUT
The ceramic shell is removed by vibration knocking and the cluster is cleaned.
9.CUT OFF
Castings are cut off from the gating system.
10.MACHINING,SURFACE FINISH,AND INSPECTION
After cut off and gate removal, all secondary finishing operations are performed. Each casting is inspected according to customer specifications and requirements.

AISI Standard CNC Machining Parts Hoop 2205 Stainless Steel CF3M Clamp Parts 0

 

 

 

Equipments                                                                                                                             

 

ABLinox own casting foundry,mold center,CNC machining center,polishing workshop in one location.

ABLinox can be your one-stop-shop and has in-house machining capabilities as well as outside machining services available for specialized machining.

ABLinox has the know-how and experience to provide a turn-key product ready for assembly.We are fully responsible for quality of mould design,raw castings,machining and finish.

Our Service                                                                                                                               

 

1. Sample is available.
2. OEM/ODM products are available.
3. Professional and reliable service through the whole procedure
4. Superior quality compared to other suppliers .
5. The raw material will be tested by German Spectrograph.
6. The 50,000 SQM factory and the newly founded Casting Workshop guarantees our capacity.
7. The advanced equipments and qualified engineers ensures the quality of products.
8. The professional sale team can provide you our best services.

Feedback Time: within 12 hours
Quotation Time: within 48 hours
Mold Making: 7-15 days
Sample Making: 5-7 days
Delivery Time: 20 to 35 days

AISI Standard CNC Machining Parts Hoop 2205 Stainless Steel CF3M Clamp Parts 1

Quality Control

 

1. In order to ensure the quality of the orders , our independent QC members to carry out strictly inspection at each stage

 

2. Incoming material inspection

 

3. Inspection of work-in -progress

 

4. Finished product inspection

 

5. Random warehouse inspections

 

6. All of our operations are strictly compliant with ISO 9001:2008 guidelines

 

AISI Standard CNC Machining Parts Hoop 2205 Stainless Steel CF3M Clamp Parts 2

Get in touch with us

Enter Your Message

You Might Be Into These